Every first Monday of the month we have a standing trail maintenance day. This month it was postponed a week to the second Monday. Today six stewards came out to take on several jobs: Elizabeth Garsonnin, Priscilla Miles, Dan Noreen, Kurt Teuber, the SOT Chair, and myself.
We started with a project to reinforce the railroad tie steps not far in from the Kiosk and parking area at the main trailhead. We used our recently acquired wagon to haul 30 cement pavers in to stack under the railroad ties. We had shims and a rubber mallet to drive them in. That didn’t take very long, so we went on to the next job.
We weeded and swept the steps at the kiosk (see picture). With six people, again the job didn’t take very long and then we were off to the last jobs we had lined up for the day.
Two of us were sent off to the set of upper steps not far below the upper meadow to weed and sweep them. Getting the loose rock off the steps prolongs their life, as it prevents hikers from grinding the rock into the steps and wearing them down faster.
The remaining four of us took on a “Rock Patrol” assignment. There was a particular rock we had in mind that not only was a hazard to hikers, but would also likely cause problems for the trail crew coming out soon to do some major trail work (see “before” picture).
Dan easily levered out the boulder, which came out surprisingly easy, and then we worked to fill the hole with soil collected nearby (see “after” picture). Since we were so quickly successful, I looked around and discovered a number of other rocks right in the trail that we could remove to create a smoother tread. All told, we probably removed about a dozen nuisance rocks from the trail, filling in the holes.
We accomplished quite a bit in just under two hours of work.
Very impressive and inspiring too. Looking forward to a walk in the hills soon.